A.Whether working days
B.Weather working days
C.Running days
D.Calendar days
您可能感興趣的試卷
你可能感興趣的試題
A.Because
B.Owing to
C.From
D.For the account of
A.when was your vessel built
B.at what time is your vessel building
C.when is your vessel built
D.at what time you built your vessel
最新試題
LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.
I look forward to()for this at your earliest convenience.
I suppose the winchman is()for the damage to the case.
In telex abbreviations,CFM and INFM refer to()and()respectively.
I regret()you of the accident.
The expression THE AIR IS SATURATED means().
Marks and Nos.,Number and kind of packages,description of goods should be declared in ().
Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.
The abbreviation RYC in a marine cable generally stands for().
I immediately telephoned the engine room to tell()was happening to the C/E.