單項(xiàng)選擇題It is the responsibility of the Master or person in charge of a ship to ensure that().

A.the station bill is posted in each compartment
B.temporary personnel and visitors are advised of emergency stations
C.names of crew members are listed on the station bill
D.no changes are made to the station bill


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題It is the chief mate’s job()the tank cleaning operation.

A.to plan
B.planning
C.for planning
D.in planning

2.單項(xiàng)選擇題It is requested that the ship’s personnel are()the port regulations.

A.to conform to
B.to draw up
C.to comply with
D.to be applicable to

4.單項(xiàng)選擇題In terms of vessel manning,a watch is the().

A.direct performance of deck or engine operations in a scheduled and fixed rotation
B.performance of maintenance work necessary for the vessel's safe operation,on a daily basis
C.performance of lookout duties
D.direct performance of cargo loading and discharge operations only

5.單項(xiàng)選擇題He is()a carpenter as a chief officer.

A.more
B.not so much
C.rather
D.not such

最新試題

It should be observed()the master is not bound to show both the number of packages and the weight.

題型:單項(xiàng)選擇題

After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().

題型:單項(xiàng)選擇題

It is the responsibility of the person in charge to().

題型:單項(xiàng)選擇題

It is requested that the ship’s personnel are()the port regulations.

題型:單項(xiàng)選擇題

Even in the absence of express instructions,the authority of the master of a ship is very large and()to all acts that are usual and necessary for the employment of the ship.

題型:單項(xiàng)選擇題

During an abandonment or drill,the first person to arrive at the survival craft should().

題型:單項(xiàng)選擇題

Compliance with the terms of the load line certificate on a vessel is the responsibility of the().

題型:單項(xiàng)選擇題

As Chief Officer of a vessel underway,it comes to your attention that the vessel is,in some manner,unseaworthy. Under such circumstances the Master is required to take action upon receiving().

題型:單項(xiàng)選擇題

The document which acknowledges that the cargo has been received and is in the carrier’s custody is called the().

題型:單項(xiàng)選擇題

Masters are required to notify Port Authorities of anchorage bearings after().

題型:單項(xiàng)選擇題