A.coil it down
B.heave it taut
C.stow it below
D.secure it to a cleat
您可能感興趣的試卷
你可能感興趣的試題
A.the supercargo's
B.the shipper's
C.the merchant's
D.the consignee's
A.Surge
B.Roll
C.Sway
D.Yaw
A.be secured
B.be sincere
C.be simulated
D.be signature
A.tenure
B.during
C.procedure
D.secure
A.half hitch,then round turns
B.round turn,then figure eights
C.figure eight,then round turns
D.figure eight,then half hitches
最新試題
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
The securing systems for containers were developed to prevent container movement during which ship motion?()
In order to correctly open a new coil of manila line,you should().
If two mooring lines are to be placed on the same bollard,which method is BEST?().
How is the size of chain determined?().
Progressive flooding is controlled by securing watertight boundaries and().
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().
Freeing ports on a vessel with solid bulwarks().
In the stowage of deck cargo,cribbing is().
The most common method of securing a line to a cleat is a().