A.and preventer have equal stress
B.stronger than the preventer to minimize the danger of separation
C.take a lighter load than the preventer as a safety factor
D.take the stress in case the preventer parts
您可能感興趣的試卷
你可能感興趣的試題
A.is stated on the vessel's Certificate of Inspection
B.is the number authorized in the Navigation Rules
C.depends on the number of lifejackets you carry
D.is the number authorized by your license
A.be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried out
B.have at least two replacement steps which are secured in position by a method different from that used in the original construction
C.have battens made of hardwood,or other material of equivalent properties,in one piece and not less than 1.80metres long provided at such intervals as will prevent the pilot ladder from twisting
D.have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface
A.IMDG
B.Hague
C.SOLAS
D.MARPOL
A.Using a small scope ratio
B.Replacing that portion with a short length of chain
C.Using a hockle to keep that portion of the anchor line off the bottom
D.Using a synthetic line
A.SOLAS Certificate is issued
B.Loadline Certificate is renewed
C.Classification society approval is issued
D.Permanent Certificate of Inspection is issued
最新試題
The size of wire rope is determined by the().
The Vessel is a()bulk carrier which is permitted to carry grain in bulk without requiring any fittings under the Rules of the 1974 International Safety of Life at Sea Convention.
Which statement about stowing spare hose is TRUE().
What equipment is customarily used when seamen are working on a stage rigged over the side of a vessel().
You are preparing to lubricate standing rigging on your vessel.When rigging a bosun’s chair on a stay with a shackle,().
SOLAS is the abbreviation of().
The ladder shall().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().
The best method of protecting that portion of a fiber anchor line nearest the anchor from chafing on the bottom is by().
Temporary Certificates of Inspection are effective until the().