A.uncorrected KG
B.maximum allowed KG
C.virtual height of the center of gravity
D.metacentric height
您可能感興趣的試卷
你可能感興趣的試題
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.open and individual tank valves open
B.open and the individual tank valves closed
C.closed and the individual tank valves closed
D.closed and the individual tank valves open
A.start to load at maximum pressure
B.start to load slowly
C.increase the air flow into the tank
D.use the overall method of loading only
A.increase
B.decrease
C.stop
D.remain constant
A.DANGER - KEEP AWAY
B.DANGER - EXPLOSIVE VAPORS
C.DANGER - NO SMOKING
D.DANGER - FLAMMABLE LIQUID
最新試題
Joiner bulkheads on a vessel provide().
After an IOPP Certificate is issued to an inspected vessel,how many other surveys of the vessel’s pollution prevention equipment are conducted during the period of validity of the certificate?()
If you are bunkering and you close off one tank in the line of tanks being filled,the rate of flow to other open tanks on the same line will().
Every new crude oil tanker of 20000 tons deadweight and above shall be fitted with a cargo tank cleaning system using().
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?().
Every oil tanker operating with dedicated clean ballast tanks shall be()with a Dedicated Clean Ballast Tank Operation Manual detailing the system and specifying operational procedures.
Gasoline fuel tank vents should terminate().
On the all-purpose nozzle,the position of the valve when the handle is all the way forward is().
For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.
In which case is the IOPP Certificate of an inspected vessel NOT invalidated? ()