A.Towing operations
B.Rigid coupled towing
C.Close coupled towing
D.Hard coupled towing
您可能感興趣的試卷
你可能感興趣的試題
A.VTS point
B.Way point
C.Reference point
D.Establishment point
A.How long
B.How length
C.How many times
D.How many shift
A.dust
B.sea water
C.land sand
D.wind
A.In
B.On
C.To
D.For
A.Continue
B.Start
C.Commence
D.Stop
最新試題
I will pass()Utopia.
My ship()heavy weather during this voyage.
A MARK OR POSITION AT WHICH A VESSEL IS REQUIRED TO REPORT TO ESTABLISH ITS POSITION defines().
I read you().
I read you with signal strength().
()view of the fact,I wish to submit this report.
Get everything ready()sailing.
Can you()survivors?
()the packing is the same,the lots are different in marks.
Captain said that very clearly so that nobody was in any()about what was meant.