The network is displayed in the diagram below:
You have just been hired by to help their main office expand. The main offices have enhanced their wiring closets with some Layer 3 switches. The new distribution layer switch has been installed and a new access layer switch cabled next to it. Your task is to configure the distribution layer and access layer
switch with VTP to share VLAN information, then to configure inter-VLAN routing on the distribution layer switch to route traffic between the different VLANs that are configured on the access layer switches.
VTP Domain Distribution
VLAN Ids 20 31
IP Addresses 172.16.71.1/24 172.16.132.1/24
These are your specific tasks:
1. Configure the VTP information with the distribution layer switch as the VTP server
2. Configure the VTP information with the access layer switch as a VTP client
3. Configure VLANs on the distribution layer switch
4. Configure inter-VLAN routing on the distribution layer switch
5. Specific VLAN port assignments will be made as users are added to the access layer switches in the future.
6. All VLANs and VTP configurations are to completed in the global configuration
To configure the switch click on the host icon that is connected to the switch be way of a serial console cable.
您可能感興趣的試卷
你可能感興趣的試題
Configure the Multilayer Switch so that PCs from VLAN 2 and VLAN 3 can communicate with the Server.
A.TCP retransmits
B.benign
C.greedy
D.drop sensitive
E.smooth
F.delay insensitive
Refer to the exhibit. The command spanning-tree guard root is configured on interface Gi0/0 on both switch S2 and S5. The global configuration command spanning-tree uplinkfast has been configured on both switch S2 and S5. The link between switch S4 and S5 fails.
Will Host A be able to reach Host B? ()
A.Yes. Traffic can pass either from switch S6 to S3 to S2 to S1, or, from switch S6 to S5 to S2 to S1.
B.No. Traffic will pass from switch S6 to S5 and dead-end at interface Gi 0/0.
C.No. Traffic will loop back and forth between switch S5 and S2.
D.Yes. Traffic will pass from switch S6 to S3 to S2 to S1.
E.No. Traffic will either pass from switch S6 to S5 and dead-end, or traffic will pass from switch S6 to S3 to S2 and dead-end.
最新試題
Which two statements are true when the extended system ID feature is enabled? ()
Refer to the exhibit. On the basis of the output of the show spanning-tree inconsistentports command, which statement about interfaces FastEthernet 0/1 and FastEthernet 0/2 is true?()
During routine maintenance, it became necessary to shutdown G1/0/1 on DS1 and DS2. All other interface were up. During this time, DS1 became the active device for Vlan104’s HSRP group. As related to Vlan104’s HSRP group. What can be done to make the group function properly ? ()
Which statement is correct about RSTP port roles?()
Refer to the exhibit. Which statement is true about the output?()
Based on the show spanning-tree vlan 200 output shown in the exhibit, which two statements about the STP process for VLAN 200 are true? ()
Refer to the exhibit. For what purpose is the command show ip cef used?()
Which two statements about the various implementations of STP are true?()
Refer to the exhibit. LACP has been configured on Switch1 as shown. Which is the correct command set to configure LACP on Switch2?()
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()