A.2
B.3
C.4
D.20
E.22
F.24
您可能感興趣的試卷
你可能感興趣的試題
A. VT circuits
B. STS circuits
C. VT tunnel circuits
D. 1:1 protection circuits
E. 1:N protection circuits
Click the Exhibit button. Given the information shown in the exhibit, when creating 2 DS1 circuits, how many STS ports are used on the VT1.5 matrix at Node 1 as VT circuits and how many are used after using VT tunnels?()
A.2;0
B.3;2
C.3;5
D.4;0
E.6;0
F.6;2
A. Slot 2 and Slot 4
B. Slot 4 and Slot 6
C. Slots 5 or 13 only
D. Slot 16 and Slot 17
Click the Exhibit button. Which type of protection is shown in the exhibit?()
A.1+0
B.1+1
C.1:1
D.1:N
A.0
B.1
C.2
D.3
E.4
最新試題
On an ONS 15454 node you can tunnel an ().
SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)
What three in combination are factors that can cause four-wave mixing in fiber-optic cables? ()(Choose three.)
If the dispersion of a given fiber is 17ps/nm*km at 1550 nm and zero at 1310 nm, then what is the accumulated dispersion of an ITU wavelength after it travels 200 km?()
The ONS 15216 is a 32-channel system. The ONS 15216 OADMs are capable of adding and dropping one, two, or four channels. How are the OADMs provisioned to add and drop specific channels?()
UPSR protection switching is initiated by (), while BLSR is initiated by ().
Click the Exhibit button. Given the following parameters: transmitter output (min): -2 dBm receiver input (min): -28 dBm 15216 Mux and Demux loss: 4.5 dB 16 channels maximum In which sites shown in the exhibit could the 15216 EDFAs be placed to minimize the number of EDFAs needed?()
If node 2 is accepting line timing from node 1, node 2 will send ()to node 1 as its SSM message.
Click the Exhibit button. The exhibit shows a 15454/15216 DWDM system and alarm indications. What are two possible sources of trouble shown in the system?() (Choose two.)
Which device creates an OEO conversion?()