A.will have been pulled
B.will be pulling
C.will have pulled
D.will be pulled
您可能感興趣的試卷
你可能感興趣的試題
A.in blame
B.in blaming
C.to have blame
D.to blame
A.in
B.on
C.to
D.for
A.all in all
B.after all
C.above all
D.over all
A.in
B.by
C.of
D.against
A.inform
B.informing
C.to inform
D.will inform
最新試題
The broadcast will normally be made on the two listed frequencies simultaneously except during transmitter maintenance periods when the broadcast will be made on the two frequencies().
I regret()you of the accident.
In telex abbreviations,CFM and INFM refer to()and()respectively.
Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.
I saw your man not operating the winch gear()gear.
My ship is()No.5 Berth for loading.
I submit this report()your record.
I suppose that when I come back from sea in one year’s time all these old houses()down.
LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.
I wish to inform you that as a result of negligence on the part of the lighter Susan when shifting at 0910 hrs this morning,the lower platform of the gangway was().