單項選擇題Upon underwater detection,there were no apparent defects on the bottom plates,bilge keels,rudder and propeller of the said vessel.This kind of wording usually appeared on().

A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題I saw the cargo surveyor()the cargo on deck just a minute ago.

A.examine
B.to examine
C.being examined
D.examining

2.單項選擇題The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().

A.bow and stern lines
B.breast lines
C.halyards
D.warps

3.單項選擇題Chain slings are suitable for heavy slender articles,such as().

A.timber or steel rails
B.locomotives or boilers
C.railway passenger coaches
D.motor vehicles

4.單項選擇題Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().

A.the customs
B.the Register Bureau of shipping
C.the shipyard fire department
D.a certified gas chemist

5.單項選擇題The conclusion is()the said ship is fit to continue to sail.

A.it
B.this
C.that
D.what

6.單項選擇題The end of the joint with the exterior threads is called the().

A.pin
B.stem
C.box
D.stand

7.單項選擇題Chafing gear().

A.reduces and prevents corrosion of standing rigging
B.prevents corrosion of running rigging
C.reduces and prevents wear caused by the rubbing of one object against another
D.protects the body against extreme cold

8.單項選擇題The angle at which the anchor flukes penetrate the soil is the().

A.burial angle
B.penetration angle
C.fluke angle
D.holding angle

9.單項選擇題The annual survey for endorsement of a Load Line Certificate must be held within().

A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date

10.單項選擇題In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()

A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator