A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
您可能感興趣的試卷
你可能感興趣的試題
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
最新試題
The angle at which the anchor flukes penetrate the soil is the().
The document on a vessel,annually endorsed by an American Bureau of Shipping surveyor,is called the().
Please arrange()a surveyor to inspect the damaged bulkhead.
Chafing gear().
The end of the joint with the exterior threads is called the().
The burden of proving unseaworthiness is upon those who()it.
The conclusion is()the said ship is fit to continue to sail.
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
At()an occasional survey has been carried out.
Cracks may be prevented from developing at the corners of welded plating inserts by().