A.to be carried out
B.carry out
C.be carried out
D.will carry out
您可能感興趣的試卷
你可能感興趣的試題
A.of
B.for
C.with
D.in
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
最新試題
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
Chain slings are suitable for heavy slender articles,such as().
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
Please arrange the survey()early.
Please arrange()a surveyor to inspect the damaged bulkhead.
The bottom of the mast rests on a part of the keel called the mast().
The angle at which the anchor flukes penetrate the soil is the().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.