A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date
您可能感興趣的試卷
你可能感興趣的試題
A.holding angle
B.fleet angle
C.fluke angle
D.shank angle
A.burial angle
B.penetration angle
C.fluke angle
D.holding angle
A.bower anchors
B.kedge anchors
C.spare anchors
D.stream anchors
A.relayed
B.delayed
C.conveyed
D.surveyed
A.opposite directions on the same line,tending to pull the material apart
B.opposite directions on the same line,tending to compress the object
C.opposite directions along parallel lines
D.the same direction along parallel lines
最新試題
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
The anchors on the bow are known as().
The angle at which the anchor flukes penetrate the soil is the().
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
The boom stops are installed on an offshore crane to().
The angle between the flukes and the shank of an anchor is called the().
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
The annual survey for endorsement of a Load Line Certificate must be held within().