A.route
B.track
C.heading
D.course over the ground
您可能感興趣的試卷
你可能感興趣的試題
A.course
B.track
C.heading
D.course over the ground
A.a difference in water pressure
B.the method of breaking up the water stream
C.the length of the applicator
D.All of the above
A.temperature of the air equals the temperature of the seawater
B.atmospheric pressure is 14.7 lbs. per square inch
C.relative humidity reaches 50%
D.air becomes saturated with water vapor
A.American Society of Mechanical Engineers
B.American Petroleum Institute
C.Society of Petroleum Engineers
D.American Society of Civil Engineers
A.above
B.over
C.up
D.upon
最新試題
The dangerous semicircle of a typhoon in the Southern Hemisphere is that area().
The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the().
Which statement about radio navigational warnings is TRUE().
The direction in which a vessel is steered is the course. The path actually followed is the ().
The datum from which the predicted heights of tides are reckoned in the tide tables is().
The port State control officer or the surveyor authorized by the port State Administration must be aware that()may be carried on product carriers.
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
The port State control officer will ensure that()is performed by all crude carriers either required to have a crude oil washing system or where the owner or operator chooses to install a crude oil washing system.
Which step should be taken,if possible,when the vessel must be abandoned because of a distress situation().
Where the master has not disclosed to the suppliers of necessaries that under an existing time-charter the Charterer is liable for the particular disbursements in question,()will be liable to such suppliers to that extent.