A.SOLAS Certificate is issued
B.Loadline Certificate is renewed
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
您可能感興趣的試卷
你可能感興趣的試題
A.MSA
B.American Bureau of Shipping
C.American Salvage Association
D.SOLAS Convention
A.On the Exemption Certificate
B.On the reverse of the particular SOLAS certificate affected
C.On the face of the Certificate of Inspection
D.Nowhere; the vessel must engage in international trade
A.MARPOL
B.IRPCS
C.SOLAS
D.MERSAR
A.by the Radiotelegraphy Authority of a country
B.in accordance with the Government Regulations
C.by complying with the Provisions of the National Conventions
D.under the Provisions of the SOLAS Convention
最新試題
When rigging a stage,the standing part should be fastened to the horns of a stage with which of the following hitches().
The ladder shall().
When two lines are spliced together,().
You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun’s chair.The proper way to do this is to ride down the stay on a riding shackle().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().
In a twin screw ship going half-ahead,both screws turning outboard and the rudder amidships,no current or wind,the vessel will().
The safest procedure used to rig a guy and preventer is to have the guy().
In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().
When paying out nylon line from around the bitts().
The size of wire rope is determined by the().