A.at the time of shipment
B.on vessel's arrival
C.at the time of sailing
D.at the time the voyage has been accomplished
您可能感興趣的試卷
你可能感興趣的試題
A.Length of link in inches
B.Diameter of metal in link in inches or centimeters
C.Links per fathom
D.Weight of stud cable in pounds
A.prevent stress concentration in the bulwark
B.permit easy jettison of deck cargo in an emergency
C.provide openings through the bulwarks for mooring lin
D.allow water shipped on deck to flow off rapidly
A.can be used in conjunction with wire or spring-lay rope
B.can be stored on decks exposed to sunlight
C.can hold a load even when a considerable amount of the yarns have been abraded
D.gives audible warning of overstress whereas manila does not
A.date of the test
B.load at which a test sample broke
C.name of the vessel
D.number of strands and of wires in each strand
A.stackers
B.twistlock
C.bridge fittings
D.containment booms
最新試題
The fittings used to secure a watertight door are known as().
The lashings of a stack of containers with interlocking fittings restrain the forces that cause().
Progressive flooding is controlled by securing watertight boundaries and().
I’ve already put down the remarks DECK CARGO()SHIPPER’S RISK in the Shipping Order.
If your vessel has a list to port due to negative GM and off-center weight,the first corrective measure you should take is to().
In the stowage of deck cargo,cribbing is().
Placing a lashing across a hook to prevent a fitting from slipping out of the hook is called ().
A tool consisting of a handle and releasable chain used for turning pipe or fittings of a diameter larger than that which a pipe wrench would fit is called().
A wire rope that has been overstrained will show().
If two mooring lines are to be placed on the same bollard,which method is BEST?().