A.contract
B.charter party
C.satisfaction
D.agreement
您可能感興趣的試卷
你可能感興趣的試題
A.innage
B.thievage
C.ullage
D.the tank's datum point
A.compartmentalization
B.watertight integrity
C.structural support
D.tank boundaries
A.should be supported at 24 inch intervals with plastic tie wraps
B.should never be located in a tank
C.must be installed in conduit
D.All of the above
A.uncorrected KG
B.maximum allowed KG
C.virtual height of the center of gravity
D.metacentric height
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
最新試題
Each fire pump on a tanker must have a pressure gauge located at().
Notwithstanding the provisions of this Regulation,the segregated ballast conditions for oil tankers less than 150 meters in length shall be to the()of the Administration.
Of the following,the most important consideration for a tanker is().
Increasing the number of slack liquid tanks has the effect of raising the().
Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be()with segregated ballast tanks.
Joiner bulkheads on a vessel provide().
Oil may NOT be transferred unless().
Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be()with segregated ballast tanks.
Before you start an engine in a compartment,it’s MOST important to().
For the purpose of()tank or hold washings from any vessel,an application shall be made to Harbor Authorities for approval.