A.reduce the draft of the barge
B.shorten one leg of the bridle
C.place bulky deck loads as far aft as possible
D.trim the barge down by the bow
您可能感興趣的試卷
你可能感興趣的試題
A.Frequent stability calculations required
B.Thorough pre-planning required
C.Limiting depths alongside berths restrict barge drafts
D.Minimum trim and 0°list are required for optimum operations
A.expected towing forces
B.capability of retrieving gear
C.freeboard of the unit being towed
D.need to reduce yaw
A.trim the tow by the bow
B.trim the tow by the stern
C.list the tow to windward
D.adjust the length of the towing bridle
A.Two to four feet by the bow
B.Slightly by the bow
C.No trim should be permitted
D.Slightly by the stern
A.liquid commodities in containers
B.bottled liquid commodities
C.common liquid commodities in bulk
D.liquid commodities in cylinders
最新試題
Prior to backloading portable tanks or drums onto an offshore supply vessel,check that each tank is().
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
When fruit is carried as refrigerated cargo,the most frequent cause of its being infected at the discharge port is().
Generally speaking,the heavier cargo will go into the(),distributing it evenly fore and aft,the lighter cargo will probably be placed in the().
The greatest strain,when lifting a load with the jumbo purchase,is on().
Ullages are measured from().
When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()
Cargo that is suitable for carriage on Ro-Ro vessels includes().
If reefer spaces are not properly cleaned prior to loading cargo,it will most likely cause().
An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when().