A.Cranes/derricks
B.Crane/derrick cycles
C.Crane/derrick cycle time
D.Weight per package
您可能感興趣的試卷
你可能感興趣的試題
A.Date and description of each failure
B.Average load in pounds for each usage
C.Total number of lifts for each usage
D.All of the above
A.less jerky starts
B.less jerky stops
C.overheating worries
D.none of the overheating worries
A.breaking a cargo runner
B.parting guys topping lifts
C.carrying away a block
D.overheating the resistors and eventually burning out
A.the speed to be retarded by the friction brake
B.a load to go downward at full speed
C.the circuit breaker to turn off
D.the resistors to overheat and eventually burn out
A.International Cargo Bureau Regulations
B.Load Line Regulations
C.Rules and Regulations for Cargo and Miscellaneous Vessels
D.Vessel's classification society rules and regulations
最新試題
When instructing a crew member concerning the right way to lift a weight,you would instruct him to().
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().
What is meant by the term“l(fā)uffing the boom”of a crane().
What is the purpose of the equalizing beam aboard a crane vessel().
How should you signal the crane operator to hoist().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
When discharging an oil cargo,the first consideration is to().
When viewed from above,the best position for the guy in relation to the boom is().
Most pedestal crane power is provided by().
How should you signal the crane operator to lower the boom and raise the load().