A.when the line pull reaches the rated winch capacity
B.after the line pull exceeds the rated winch capacity
C.after a short build-up of torque
D.immediately
您可能感興趣的試卷
你可能感興趣的試題
A.anchoring
B.mooring
C.sewing
D.splicing
A.cargo runners
B.stays
C.topping lifts
D.All of the above
A.fatigue
B.corrosion
C.distortion
D.abrasion
A.wooden blocks or dunnage placed between a deck load and the deck
B.the chains and shackles used to secure a deck cargo
C.a crate in which a deck cargo is packaged
D.cardboard separation pieces placed between deck loads to prevent chafing
A.has less strength than manila line
B.has more strength than manila line
C.is equivalent to manila line
D.will rot quicker than manila line
最新試題
A splice that can be used in running rigging,where the line will pass through blocks,is a().
In moderate wind and current what should be the length of chain with a single anchor?()
Back-up wires on a towed vessel provide().
The purpose of a devil’s claw is to().
Herringbone is a term associated with().
Neglecting friction,you desire to lift a 300 kgs weight with a stress on the hauling part of 100 kgs.Which of the following tackles would you use?().
Cribbing is().
The strongest method of forming an eye in wire rope is using().
The rope which is the lightest is().
Limit switches on gravity davits should be tested by().