單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement a secure OSPF network to support traffic between clients on the 172.16.10.0/24 network and the file server on the 172.16.20./24 network. You have been asked to review the implementation and verification plans for this OSPF project. Which statement about the plan is true? ()

A. It is complete as written
B. It should include a task that verifie s that the interarea routes are using the proper MED
C. It should include a task that verifies that load sharing is active on R1 and R4
D. It should include a task that verifies that all redundant links will become active when the primary links are sh ut down


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement a secure OSPF network to support traffic between clients on the 172.16.10.0/24 network and the file server on the 172.16.20./24 network. You have been asked to review the implementation and verification plans. Which statement about the plan is true?()

A. It is complete as written
B. It should include a task that verifies that the interarea routes are using the proper MED
C. The plan should include a task that verifies that load sharing is active on the appropriate links
D. The plan should include  a task that verifies end - to - end connectivity between the clients and the file server

2.單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement a new secure OSPF network to support traffic between clients on the 172.16.10.0/24 network and the file server on th e 172.16.20./24 network. You have been asked to review the implementation plan for the OSPF project. Which statement about the plan is true?()

A. It is complete as written.
B. It should include a task that shuts down all unused interfaces.
C. It sho uld include tasks that enable and verify OSPF authentication.
D. It should include a task that establishes a file transfer baseline before and after the configuration is changed.

3.單項(xiàng)選擇題

Refer to the exhi bit. ROUTE.com is planning to implement load balancing for traffic between host on the 172.16.10.0/24 and 172.16.20./24 networks. You have been asked to review the implementation plan for this project. Which statement about the plan is true?()

A. It is complete as written.
B. It should include a task to configure multipath to equal a value of 2 on R1 and R4.
C. It should use a ping instead of a traceroute to validate that load balancing has been activated.
D. It should conta in a task that documents the changes made to the configurations.

4.單項(xiàng)選擇題

Refer to the exhibit. ROUTE.com is planning to implement load balancing for traffic between hosts on the 172.16.10.0/24 and 172.16.20./24 networks. You have been ask ed to review the implementation plan for this project. Which statement about the plan is true?()

 

A. It is complete as written.
B. It should include a task to configure EIGRP multipath equal to 2 on R1 and R4.
C. It should inc lude a task to implement OSPF because it handles unequal cost load balancing most efficiently using variance.
D. It should include a task that establishes a baseline before and after the configuration has been changed.

最新試題

Which of the following are true of both OSPFv2 and OSPFv3?()

題型:多項(xiàng)選擇題

Router R1 has two LAN interfaces and three serial interfaces enabled for IPv6. All the inte rfaces use link local addresses automatically generated by the router.Which of the following could be the link local address of R1's interface S0/0?()

題型:?jiǎn)雾?xiàng)選擇題

Look at the following configuration below and select the statements that are true.()RD2(config)#router ospf 100RD2(config - router)# distance 180 10.1.10.1 0.0.0.0 match - meRD2(config -router)#!RD2(config - router) #ip access - list standard match - meRD2(config - std - nacl)# permit host 172.16.0.0

題型:多項(xiàng)選擇題

An engineer is trying to summarize the following networks using the "ip summary- address eigrp"command:10.8.88.0/2510.8.89.48/2910.8.64.96/27Which network and subnet mask below would be the smallest EIGRP summary address to include all three subnets?()

題型:?jiǎn)雾?xiàng)選擇題

An enterprise has plans to start adding IPv6 support. The initial deployment requires support from some IPv6 - only device s that need to access servers that support only IPv4.Which of the following tools would be most appropriate?()

題型:?jiǎn)雾?xiàng)選擇題

Router R1 sits  at an Enterprise branch office, using both the Internet and a leased line to another Enterprise router for its two connectivity options back into the rest of the Enterprise network. The engineer planning for this branch decided to use the leased line for all Enterprise traffic, unless it fails, in which case the Internet connection should be used to pass traffic to the Enterprise.Which of the following is most likely to be useful on the branch router?()

題型:多項(xiàng)選擇題

Which of the following is helpful to allow an IPv6 host to learn the IP address of a default gateway on its subnet?()

題型:?jiǎn)雾?xiàng)選擇題

Router R1 lists the following output from a show command. Which of the following is true about R1?()R1# show ip v6 interface f0/0FastEthernet0/0 is up, line protocol is upIPv6 is enabled, link - local address is FE80::213:19FF:FE12:3456No Virtual link - local address(es):Global unicast address(es):2000::4:213:19FF:FE12:3456, subnet is 2000:0:0:4::/64 [EUI]Jo ined group address(es):FF02::1FF02::2FF02::1:FF:12:3456

題型:?jiǎn)雾?xiàng)選擇題

The following line of output was gathered on Enterprise Router Ent1 using the command show ip route. Which of the following answers is most likely to be true, based on thi s output?()B 128.107.0.0 [20/10] via 11.11.11.11, 00:02:18

題型:?jiǎn)雾?xiàng)選擇題

The answers each list a tunnel method and two consecutive IPv6 address quartets.Which answers identify a tunneling method that relies on an IPv4 address to be embedded into an IPv6 address, within the correct quartets listed?()

題型:多項(xiàng)選擇題