A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance.
What will support the customer requirement at least cost?()
A.Build the logical partition infrastructure based on 6 or more VLANs.
B.Build the logical partition infrastructure based on two or more IVEs.
C.Build the logical partition infrastructure based on Partition Mobility.
D.Build the logical partition infrastructure based on redundant VIO Servers.
您可能感興趣的試卷
你可能感興趣的試題
A.Verification of the expected performance of the new solution.
B.A document used by IBM manufacturing to build and ship the system solution.
C.An IBM Quality Assurance Certificate which is supplied to the customer with the system.
D.A list of actions that are recommended to reduce risk and create a successful implementation.
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A.Implement PowerHA SystemMirror on both VIO servers.
B.Configure Etherchannel between the client LPARs and the two VIO servers.
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower.
What contributes to the improved performance?()
A.Added Turbo memory switching
B.Removed internal OLTP limits
C.Moved L3 cache onto the chip
D.Increased DDR2 memory speeds
A.1
B.2
C.4
D.6
A.SSD
B.SSA
C.SAS
D.SAN
最新試題
A POWER7 processor has L1, L2 and L3 caches. Which of the three caches uses embedded DRAM (eDRAM) technology?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()
Which of the following has an integrated database?()
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()