單項選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.
Which Blade is designed for Windows workloads?()

A.HS22
B.JS43
C.QS21
D.PS701


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Which system provides the highest performance per core, and the least cost for applications licensed per core?()

A.A Power 795 withMaxCore mode
B.A Power 780 withMaxCore mode
C.A Power 755 withTurboCore mode
D.A Power 780 withTurboCore mode

2.單項選擇題

A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.
Which of the following design consideration statements is correct?()

A.The Blades must use the same CIOv and CFFh expansion adapter types.
B.Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86  Blades.
C.The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades  are in bays 1-7 and the x86 Blades are in slots 8-14.
D.The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).

3.單項選擇題Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()

A.Redundant system clocks
B.Redundant service processors
C.eDRAM chips have redundant L3 cache
D.Main memory DIMMs contain a redundant DRAM chip

4.單項選擇題Which of the following has an integrated database?()

A.AIX
B.IBM i
C.Linux
D.VIO Server

5.單項選擇題Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()

A.3 PCI-e I/O drawers and 1 PCI-X I/O drawer
B.4 PCI-e I/O drawers and 4 RIO-2 I/O drawers
C.2 PCI-e I/O drawers and 4 PCI-x I/O drawers
D.4 PCI-e I/O drawers and 2 PCI-X I/O drawers

最新試題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:單項選擇題

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()

題型:單項選擇題

Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

題型:單項選擇題

A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions.Which configuration will provide boot disk capability to all partitions?()

題型:單項選擇題

A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()

題型:單項選擇題

A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()

題型:單項選擇題

Which of the following uses compression/decompression to increase the memory available for client workloads?()

題型:單項選擇題

A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()

題型:單項選擇題

A retail customer has an 8-core Power 740 server with 2 partitions. Production has 4 dedicated cores and the test partition has 2 dedicated cores. Both partitions run during the day without problems. At night, batch processing is exceeding the run window.Which solution addresses this problem without requiring additional  hardware?()

題型:單項選擇題

A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()

題型:單項選擇題