A.Support for a single VIO Server environment
B.Adapters can be dedicated or virtual for each LPAR environment
C.Interfaces with Systems Director to manage the Power Systems servers
D.Supports multiple Power Systems servers from a single point of control
您可能感興趣的試卷
你可能感興趣的試題
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup.
Which solution provides tape library sharing with minimum operator intervention?()
A.Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.
B.Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape library connection to the AIX and Linux partition.Assign the library to the production partitions when needed.
C.Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.
D.Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.
A.The new system requires 1 installed processor card for the GX++ bus adapter
B.The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
C.The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
D.The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
A.CoD and PCI hot-plug
B.DLPAR and Active Memory Sharing
C.Hot node add and hot node repair
D.D.ynamic processor failure and processor instruction retry
A.Enable automatic problem reporting from smit
B.Use IVM to enable console mirroring to IBM Remote Support.
C.Use the HMC to enable reporting through Electronic Service Agent.
D.Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.
What is needed to read the exported system plan and design the new system?()
A.e-Config
B.System Planning Tool (SPT)
C.IBM Workload Estimator (WLE)
D.IBM Performance Monitor (PM)
最新試題
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()
Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()
Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750.Which action allows the most efficient use of existing equipment?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()