單項(xiàng)選擇題A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()

A.Enable automatic problem reporting from smit
B.Use IVM to enable console mirroring to IBM Remote Support.
C.Use the HMC to enable reporting through Electronic Service Agent.
D.Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.


您可能感興趣的試卷

你可能感興趣的試題

3.單項(xiàng)選擇題Which data synchronization options between two geographical locations are supported by PowerHA SystemMirror?()

A.Parallel and Serial
B.Serial and Asynchronous
C.Parallel and Synchronous
D.Synchronous and Asynchronous

4.單項(xiàng)選擇題

A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure.
Which solution addresses the customer  requirements?()

A.Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
B.Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
C.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
D.Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

5.單項(xiàng)選擇題

A customer would like to have the ability to permanently activate processor and memory resources as their workload increases.
Which of the following supports the customer requirement?()

A.Reserve Capacity on Demand
B.Utility Capacity on Demand
C.Capacity Upgrade on Demand
D.Uncapped Capacity on Demand

最新試題

A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

題型:?jiǎn)雾?xiàng)選擇題

An end user is deploying Blade servers to replace obsolete rack mounted servers. In addition to AIX Web server and database workloads, they also have Windows workloads.Which Blade is designed for Windows workloads?()

題型:?jiǎn)雾?xiàng)選擇題

Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()

題型:?jiǎn)雾?xiàng)選擇題

A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage.Which system software solution component supports the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

Ancustomer with limited storage management skills needs a disk subsystem with up to 70TB capacity and enterprise class performance. Which disk storage system should be recommended?()

題型:?jiǎn)雾?xiàng)選擇題

A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()

題型:?jiǎn)雾?xiàng)選擇題

A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

題型:?jiǎn)雾?xiàng)選擇題

A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()

題型:?jiǎn)雾?xiàng)選擇題

A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which  also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed  systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.How can they manage the new machines for the least cost?()