A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.
Which of the following design consideration statements is correct?()
A.The Blades must use the same CIOv and CFFh expansion adapter types.
B.Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
C.The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
D.The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
您可能感興趣的試卷
你可能感興趣的試題
A.Redundant system clocks
B.Redundant service processors
C.eDRAM chips have redundant L3 cache
D.Main memory DIMMs contain a redundant DRAM chip
A.AIX
B.IBM i
C.Linux
D.VIO Server
A.3 PCI-e I/O drawers and 1 PCI-X I/O drawer
B.4 PCI-e I/O drawers and 4 RIO-2 I/O drawers
C.2 PCI-e I/O drawers and 4 PCI-x I/O drawers
D.4 PCI-e I/O drawers and 2 PCI-X I/O drawers
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs.
How can they manage the new machines for the least cost?()
A.Purchase a second HMC and use this to manage the new servers.
B.Connect all of the new servers to the existing private HMC network.
C.Configure a second private network on their existing HMC for the new servers.
D.Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server.
Which action will reduce the potential vendor software costs?()
A.Create capped partitions for the database servers.
B.Create workload partitions for the database servers.
C.Create a separate shared processor pool for the database servers.
D.Create virtual processors equal to the entitlement for database servers.
最新試題
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware.Which of the following meets these requirements?()
A customer wants to implement the following Blades in BladeCenter H:Two POWER Blades running IBM i partitions.Two POWER Blades running AIX and LinuxFour x86 Blades running Windows.Which of the following design consideration statements is correct?()
Using the following information: Performance data from an existing system that a new system will replace; Performance estimates that anticipate future workloads; Micro-partitioning and logical partitioning implementations.Which of the following allows a technical sales representative to create a system design which can be imported into an HMC?()
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()
A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
A customer has an LPAR with 4 dedicated cores on a POWER7 server with SMT4 enabled. How many logical processors are presented to an application running on this LPAR?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()