A.to
B.of
C.for
D.about
您可能感興趣的試卷
你可能感興趣的試題
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
最新試題
Chain slings are suitable for heavy slender articles,such as().
At()an occasional survey has been carried out.
Chafing gear().
Please arrange the survey()early.
The bottom of the mast rests on a part of the keel called the mast().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The conclusion is()the said ship is fit to continue to sail.
In which case is the IOPP Certificate of an inspected vessel NOT invalidated?()
The angle at which the anchor flukes penetrate the soil is the().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().