A.transfer containers without chassis
B.load the vessel with palletized cargo
C.transport vehicles
D.be loaded full and down to her marks
您可能感興趣的試卷
你可能感興趣的試題
A.cargo fill
B.line drop
C.transfer
D.branch line
A.the nature of the cargo being carried
B.changes in heading
C.major structural repair
D.All of the above
A.determined by the Master
B.specified by the Coast Guard
C.specified by the manufacturer
D.None
A.in the pumproom
B.at the vent header
C.at the main deck manifold
D.the midships house
A.A declaration is required and duty is involved on the total cost
B.No declaration is required since this is considered routine maintenance
C.A declaration is made and duty is charged on the materials only
D.A declaration is made,but duty is charged on the labor only
最新試題
Which of the following is the stated proper sequence before commencing cargo operations aboard Ro-Ro vessels?()
Which of the following statement(s) is/are TRUE regarding lashing requirements to secure vehicles aboard Ro-Ro vessels? ()
Which is NOT a required entry in the ship’s Official Logbook?()
Which element(s) should be taken into account in the preparation of the “Cargo Securing Manual”?()
The purpose of inert gas systems aboard tank vessels is to().
The required number and type of hand portable fire extinguishers for staterooms on cargo vessels is().
When referring to dry bulk cargoes,the term “flow state”().
The shipping papers for the products being carried in your tanker are NOT required to contain the().
The primary objective of a Ro-Ro vessel is to().
Which is a negotiable document? ()