單項選擇題()loading has not been completed,the Charterer is entitled to delay the vessel’s sailing until the expiration of lay time.

A.As long so
B.So long
C.As long
D.So long as


您可能感興趣的試卷

最新試題

If the Shipowner agrees to the voyage originally ordered by the Charterer,he is entitled to be paid hire()for the excess period.

題型:單項選擇題

If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.

題型:單項選擇題

The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.

題型:單項選擇題

The Charterers to have option of using Owners’ bunker contracts. This sentence indicates that().

題型:單項選擇題

If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the().

題型:單項選擇題

The fixing of a canceling date on a charter-party merely()warning to the Shipowner that non-arrival by this date may result so as to entitle the Charterer to rescind.

題型:單項選擇題

The master’s authority to act in the interests of the cargo owner is part of his general authorityas servant of the Shipowner,and therefore()will be liable if the master abuses his powers.

題型:單項選擇題

The fact that it has become impossible to procure a cargo (),as a rule,relieve the Charterer of liability.

題型:單項選擇題

The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.

題型:單項選擇題

The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.

題型:單項選擇題