A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
您可能感興趣的試卷
你可能感興趣的試題
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.Overloading
B.Overstowage
C.Overbooking
D.Overcarriage
A.Regulation of discharge pressure from cargo pumps
B.Maintaining constant velocity in cargo lines
C.Regulation of suction head on cargo pumps
D.To maintain a tank or void at atmospheric pressure
A.Electrical loading
B.Mechanical distribution
C.Compressibility of air
D.Mechanical friction
最新試題
Running an electric winch at slow speed over a long period of time causes().
How should you signal the crane operator to hoist().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
How should you signal the crane operator to lower the boom and raise the load().
Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().
Regulations concerning the stowage,lashing,and securing of timber deck cargoes aboard general cargo vessels may be found in the().
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().
They()loading at 1400 hours.
What does “evel-luffing” accomplish during crane operations().