You have just created a new VLAN on your network for inter-VLAN routing.
What is one step that you should include in your VLAN-based implementation and verification plan?()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN.
D.Verify that the VLAN virtual interface has been correctly created and enabled.
您可能感興趣的試卷
你可能感興趣的試題
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN-based implementation and verification plan? ()
A.Verify that trunked links are configured to allow the VLAN traffic.
B.Verify that the switch is configured to allow for trunking on the switch ports.
C.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
D.Verify that different native VLANs exist between two switches for security purposes.
You have just created a new VLAN on your network.
What is one step that you should include in your VLAN based implementation and verification plan? ()
A.Verify that different native VLANs exist between two switches for security purposes.
B.Verify that the VLAN was added on all switches with the use of the show vlan command.
C.Verify that the switch is configured to allow for trunking on the switch ports.
D.Verify that each switch port has the correct IP address space assigned to it for the new VLAN.
A.approval from senior management
B.end-user requirements
C.IEEE 802.1X authentication parameters
D.a summary implementation plan
A.Perform an incremental implementation of components.
B.Following the PPDIOO model, implement the entire solution and then test end-to-end to make sure that it is performing as designed.
C.Implement trunking of all VLANs to ensure that traffic is crossing the network as needed before performing any pruning of VLANs.
D.Test the solution on a segmented portion of a lab network prior to rolling out across the entire network.
You are planning a new VLAN-based network solution.
What is one item you should consider when creating your implementation plan as it concerns VLANs?()
A.generic router and switch configuration parameters
B.end-to-end test plan after all components have been installed and configured
C.administrator assignments
D.rollback plan
最新試題
What will occur when a nonedge switch port that is configured for Rapid Spanning Tree does not receive a BPDU from its neighbor for three consecutive hello time intervals?()
Refer to the exhibit. The command switchport mode access is issued on interface FastEthernet0/13 on switch CAT1. What will be the result?()
Refer to the exhibit. What does the command channel-group 1 mode desirable do? ()
Refer to the exhibit. STP has been implemented in the network. Switch SW_A is the root switch for the default VLAN. To reduce the broadcast domain, the network administrator decides to split users on the network into VLAN 2 and VLAN 10. The administrator issues the command spanning-tree vlan 2 root primary on switch SW_A. What will happen as a result of this change?()
Which option correctly identifies the Cisco IOS switching methods in descending order from the fastest method to the slowest method?()
Refer to the exhibit. What command was issued on the Layer 3 switch Sw1 between Exhibit #1 and Exhibit #2?()
Which two statements about the various implementations of STP are true?()
Refer to the exhibit. Initially, LinkA is connected and forwarding traffic. A new LinkB is then attached between SwitchA and HubA. Which two statements are true about the possible result of attaching the second link?()
Refer to the exhibit. Switch 15 is configured as the root switch for VLAN 10 but not for VLAN 20. If the STP configuration is correct, what will be true about Switch 15?()
Which two statements are true when the extended system ID feature is enabled? ()