A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance.
What will support the customer requirement at least cost?()
A.Build the logical partition infrastructure based on 6 or more VLANs.
B.Build the logical partition infrastructure based on two or more IVEs.
C.Build the logical partition infrastructure based on Partition Mobility.
D.Build the logical partition infrastructure based on redundant VIO Servers.
A.Verification of the expected performance of the new solution.
B.A document used by IBM manufacturing to build and ship the system solution.
C.An IBM Quality Assurance Certificate which is supplied to the customer with the system.
D.A list of actions that are recommended to reduce risk and create a successful implementation.
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.
Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
A.Implement PowerHA SystemMirror on both VIO servers.
B.Configure Etherchannel between the client LPARs and the two VIO servers.
C.Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
D.Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower.
What contributes to the improved performance?()
A.Added Turbo memory switching
B.Removed internal OLTP limits
C.Moved L3 cache onto the chip
D.Increased DDR2 memory speeds
A.1
B.2
C.4
D.6
最新試題
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention.Which of the following meets the customer requirement?()
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?()
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()
A customer has a 4-core POWER6 570 with 4 partitions and a 2-port 1Gbps Integrated Virtual Ethernet (IVE) Adapter. They are having problems with throughput on the Ethernet adapter and want to improve performance.Which of the following solutions will help the customer with this issue for the least cost and with the least interruption?()
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools.What is the minimum PowerVM Edition which provides this feature?()
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3).Which of these statements is true and would minimize the cost?()
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer.Which of the following must also be ordered?()
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()