A.A vessel engaged in laying,servicing or picking up a navigation mark,submarine cable or pipeline
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel engaged in replenishment or transferring persons,provisions or cargo while underway
D.A power driven vessel which because of her draught in relation to the available depth and width of navigation water is severely restricted in her ability to deviate from the course she is following
您可能感興趣的試卷
你可能感興趣的試題
A.Any aircraft designed to maneuver on the water
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel under sail provided that propelling machinery is not used
D.A small vessel sailing at night
A.are
B.is
C.have
D.has
A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report
最新試題
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
Chain slings are suitable for heavy slender articles,such as().
Please arrange the survey()early.
The conclusion is()the said ship is fit to continue to sail.
Let’s submit the case() the cargo surveyor.
Please arrange()a surveyor to inspect the damaged bulkhead.
Chafing gear().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().