A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
您可能感興趣的試卷
你可能感興趣的試題
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
A.one meter from the tank bottom and one meter below the tank top
B.one half the ullage of the tank and one meter below the tank top
C.one half the ullage of the tank and one meter above the tank bottom
D.at three meter intervals from the tank top
A.winch speed
B.boom strength
C.load radius
D.cable strength
A.discharging
B.recircling
C.loading
D.taking in
最新試題
Most pedestal crane power is provided by().
Official draft measurements should be()by authorized persons,agreed by both parties involved.
Which part provides for transverse control and positioning of a boom in a conventional yard and stay system().
The net productivity per gang-hour can be improved through a decrease of().
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
What is meant by the term“l(fā)uffing the boom”of a crane().
When discharging an oil cargo,the first consideration is to().
Pedestal cranes have limit switches to restrict movement of which function(s)().
Running an electric winch at slow speed over a long period of time causes().
What does “evel-luffing” accomplish during crane operations().