A.rigging a back stay
B.raising the boom
C.increasing the mechanical advantage of the cargo purchase
D.taking all slack out of the preventer
您可能感興趣的試卷
你可能感興趣的試題
A.provide
B.provides
C.providing
D.be provided
A.braces
B.dunnage
C.shores
D.toms
A.cargo elevators
B.conveyor belts
C.ramps
D.derricks and winches for cargo handling
A.insure
B.ensure
C.assure
D.assume
A.at
B.in
C.on
D.by
最新試題
The best way to determine if a load is within maximum lift limits is to use().
Securing cargo by running timbers from an upper support down to the cargo,either vertically or at an angle,is called().
The chassis of 15 trucks are rust-stained,particularly()near the mast house.
Vessel on her delivery shall be ready to receive cargo with clean-swept holds and()and in every way fitted for ordinary cargo service.
Unless it is specially agreed otherwise,the adjustment of the claims to contribution takes place()and is governed by the law of the place of delivery of the cargo.
There are 65()of Grade No.3 rubber short.
Precautionary measures must be taken to()safety of the stevedores,cargo and the ship.
The preventer guy,as used on a conventional yard and stay rig,().
The remarks are not similar()those on the Shipping Orders.
The actual amount of cargo loaded depends upon().