A.over
B.besides
C.near
D.underneath
您可能感興趣的試卷
你可能感興趣的試題
A.all information contained on the barge's Certificate of Inspection
B.the condition of all towing gear to be used
C.all navigational aids to be used
D.the barges load line and draft readings
A.Coast Guard
B.American Bureau of Shipping
C.Minerals Management Service
D.Mine Safety and Health Administration
A.Coast Guard
B.National Cargo Bureau
C.Minerals Management Service
D.builder
A.on the Muster List ("Station Bill")
B.at the liferaft stowage location
C.on the Certificate of Inspection
D.in the Operations Manual
A.the operator's representative
B.the crew required by the Certificate of Inspection
C.the galley personnel
D.the designated person in charge
最新試題
The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the().
The port State control officer may ensure that()are exhibited in conspicuous places throughout the ship.
The consistent winds blowing from the horse latitudes to the doldrums are called the().
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
The design specifications for cranes and crane foundations on ship’s are set and published by the().
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible?()
Which instrument is most useful in forecasting fog().
The disadvantage of using a heaving line to pass a towline is that().
What does the DSC control unit do if the GMDSS radio operator fails to insert updated information when initiating a DSC distress alert().