A.need
B.need not
C.will
D.to
您可能感興趣的試卷
你可能感興趣的試題
A.be responsible
B.not be responsible
C.pay the Shipowner for the expenses incurred
D.not claim the Shipowner for the expenses incurred
A.in the loading place
B.in the port or dock
C.in the loading spot
D.in the discharging spot
A.he
B.she
C.the owner
D.the shipper
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
最新試題
Where a propeller shaft passes through the hull,water is prevented from entering by means of a().
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().
()is not within the exception of the perils of the sea.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
A vessel is not in every way fitted for cargo service()at the time of her delivery to the charterers her engine room staff is incompetent and inadequate,and accordingly she is unseaworthy.
According to Gencon,if at any time during the currency of this Charter,both Owners and Charterers are unable to arrange bunkers at the main bunkering ports for the voyage in question,the()to have the privilege of canceling this Charter.