A.Bareboat
B.Dispatch
C.Voyage
D.Demise
您可能感興趣的試卷
你可能感興趣的試題
A.has
B.takes
C.is
D.makes
A.the shipper
B.the owner
C.the consignor
D.the consignee
A.the Charterer
B.the Shipowner
C.the shipper
D.the cargo owner
A.with
B.for
C.by
D.to
A.has
B.have
C.is
D.are
最新試題
The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().
If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the().
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
If the Shipowner has failed to carry out a term of a time charter-party whereby he undertakes to maintain the vessel in a seaworthy state,this only()the Charterer to sue him for damages,and not to repudiate the charter-party.
The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.
That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.
Unless otherwise agreed,()must take the goods from alongside,though this obligation may be varied by a custom of the port which is not inconsistent with the express terms of the contract.
If the Shipowner proves that prima facie the cause of damage was excepted,the burden ofproof shifts to().