單項(xiàng)選擇題Where a propeller shaft passes through the hull,water is prevented from entering by means of a().

A.stuffing box
B.propeller boss
C.seacock
D.stop-water


您可能感興趣的試卷

你可能感興趣的試題

3.單項(xiàng)選擇題When the Captain of the Port or Officer in Charge,Marine Inspection issues an order of suspension to the operator of a vessel concerning oil transfer operations,it().

A.is always effective immediately
B.includes a statement of each condition requiring corrective action
C.must be in writing before it takes effect
D.All of the above

4.單項(xiàng)選擇題The object of the both-to-blame collision clause is().

A.to free the carrying ship from liability
B.to free the non-carrying ship from liability
C.to free the ship in the wrong from liability
D.to free the ship not to blame from liability

5.單項(xiàng)選擇題The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

A.supplies or attempts to supply
B.imposes or attempts
C.complies or attempts to comply
D.provides or attempts to provide

最新試題

If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.

題型:單項(xiàng)選擇題

If the state of the goods at the time they were handed over to the consignee has been the subject of a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.

題型:單項(xiàng)選擇題

()payment of the hire the Owners may withdraw the Vessel from the service of Charterers,without prejudice to any claim Owners may otherwise have on Charterers under this Charter.

題型:單項(xiàng)選擇題

Where a charter-party states that a claim will be barred unless the claimant appoints an arbitrator within a specified period,the nominated arbitrator must be actually()within that period that has been appointed.

題型:單項(xiàng)選擇題

A breach of the()undertaking of seaworthiness at the port of loading entitles theCharterer to refuse to load.

題型:單項(xiàng)選擇題

Delivery of a vessel to a charterer is called().

題型:單項(xiàng)選擇題

Contracts whereby the possession and control of a ship vest()the Charterer are becoming more common today especially in the oil tanker trade.

題型:單項(xiàng)選擇題

The carrier is entitled to limit his liability to the stated sum per package or unit even if he failedto exercise due diligence to make the vessel().

題型:單項(xiàng)選擇題

A charter-party usually contains a clause stating that the master is to be under the orders of the()as regards employment,agency or other arrangements.

題型:單項(xiàng)選擇題

The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.

題型:單項(xiàng)選擇題