A.despatch
B.demurrage
C.detention
D.damage
您可能感興趣的試卷
你可能感興趣的試題
A.Cargo Declaration
B.Charter Commission
C.Charter Party
D.Letter of Intent
A.discharge
B.pertain
C.retain
D.remain
A.is entitled to discharge the goods at the port of loading or any other safe and convenient place and terminate the contract of carriage
B.is not entitled to terminate the contract of carriage
C.is not entitled to claim against the shipper or charterer any damage that he will suffer with the cargo on board
D.is entitled to claim freight with the cargo on board
A.he must procure a cargo and bring it alongside the vessel
B.he must load a full and complete cargo
C.he must load in the time stipulated
D.he must have the vessel tightly secured to the quay where the loading is to take place
A.to
B.by
C.in
D.of
最新試題
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.
The Shipowner must not stow goods on deck()there is a trade usage to that effect or the Charterer has given his express or implied consent.
If the Shipowner makes an innocent misrepresentation which induces the Charterer to sign the contract,the Charterer may be entitled to()the charter-party.
If the Shipowner has failed to carry out a term of a time charter-party whereby he undertakes to maintain the vessel in a seaworthy state,this only()the Charterer to sue him for damages,and not to repudiate the charter-party.
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
The S.S. Hollowpoint has a charter party in which the charterer assumes no responsibility for the operation of the vessel but pays stevedoring expenses. What is the name of the charter party? ().
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
The Charterer is entitled to the benefit of the excepted perils during the transit of the goods from storing place to the actual place of loading,provided such transit substantially ()part of the operation of loading.